Oil Sludge Treatment Projects

E T C > Oil Sludge Treatment Projects

Oil Sludge Treatment Projects

SR# Project name Client Start Date End Date Scope of Work
1 Contract No. HQ925EL13 – Clean-up of hydrocarbon contaminated soil Khafji Joint Operations (KJO) Dec 2013 November 2018

 

Clean-up of hydrocarbon contaminated soil inside KJO or generated from any activities inside KJO different facilities.

 

2 Contract No. HQ 925 EL10 – Cleanup of Hydrocarbon Contaminated Soil Khafji Joint Operations (KJO) October 2011 May 2013 Recovery of the sellable oil and treatment of oily sludge, treatment of contaminated soil and decontaminate the 2 ponds areas.Recovered sellable oil quantity 10,000 m³, From the two ponds. Treat of 14,000 m³ contaminated soil, in the two ponds.Treat of 3,000 m³ oily sludge, in the two ponds.
3 Contract No. HQ383EM03- Biological Treatment of Dredged Material Khafji Joint Operations (KJO) May 2006 May 2007

 

The scope of Work in Project Including Applied clean-up Method To treat dredged materials impacted from hydrocarbon from seashores to acceptable environmentally approved levels and dump and backfill treated materials.Nature of contamination (type and concentration mg/kg): Impacted sand by hydrocarbon, (4-6 %) The quantity of Treated Contaminated Soil (Ton/m3): 1,065,000 m3.

 

4 Contract # GQ373MT15- Disposal of Hazardous, Non- Hazardous Waste expired Chemicals & Materials. Khafji Joint Operations (KJO) Sept 2016 January 2017

 

Disposal of Hazardous and Non-hazardous waste & expired chemicals & materials.

 

Project Completion Certificate